Mexico City Resilient Community

Adapting to terrain through coordinated action. Territorial analysis responds to slope risks, water scarcity and vulnerable settlements through community renewal, adaptable housing, public-building renovation and water infrastructure. My work focused on spatial strategies, architectural prototypes and interdisciplinary coordination.

SDG 6 · Clean water and sanitationSDG 7 · Affordable and clean energySDG 11 · Sustainable cities and communitiesSDG 13 · Climate action
Community sports field and underground storage — concept

02Risk analysis and intervention priorities

Rainfall from 1985–2024, slopes, soils and drainage paths identify exposure of vulnerable settlements and public facilities. Concentrated risks inform priorities for reinforcement, drainage, repairs and new housing.

The research supports design comparisons and intervention priorities, rather than real-time warnings. Roads, homes and public facilities are considered together with equipment locations, maintenance access and phased implementation.

Monthly rainfall, 1985–2024
Rainfall event records
Intensity-duration-frequency curves
Open interactive map ↗

Research layers, not real-time warnings.

Soil type distribution
Subsidence risk distribution
Terrain section animation
Site plan and section locations
Terrain sections: slopes and concentrated risk
Terrain section 02

03Community activities, water infrastructure and public buildings

Buildings support different community activities. Digital access and mobile classrooms provide technical infrastructure; practical skills, online learning and entrepreneurship support education; shared spaces, childcare and flexible hours form a community support network. Training, coworking and continuing support are organised around residents’ abilities to improve use of the same public building.

Community activities, training and support network

The existing Alheña centre becomes a base for community digital services within a walkable catchment. Training rooms, services and support spaces occupy the ground floor; coworking, shared equipment and collaboration spaces occupy the upper level, connected by the existing stair. Reliable electricity, ventilation and high-speed internet are supported by solar backup, security and maintenance space.

Alheña centre and pedestrian service area
Community centre: both floor layouts

Dry-season activities include training, skills assessment and follow-up. In the rainy season, checked monitoring data enters an alert process with household notification and delivery confirmation. Two treatment options compare solar-assisted hybrid systems with passive gravity treatment, integrating first flush, filtration, disinfection, separated storage and equipment foundations, with maintenance and phased delivery in mind.

System B: passive gravity treatment
System A: solar-assisted and hybrid treatment

Roads, riparian buffers and public spaces connect neighbourhood renewal and water infrastructure. Primary roads, secondary roads and footpaths use approximate widths of 6 m, 3 m and 2.5 m. Permeable paving, drainage channels and native planting support everyday public activities.

Land-use classification and three intervention plots
Plot 1: strengthening and renovation
Plot 2: channel and riverside landscape transformation
Plot 3: new housing in safer areas

04Adaptive housing

Two-storey dwellings accommodate changing household needs through semi-public thresholds, alternative entrances and plan subdivisions.

9 m × 9 m pilot plot and entrance arrangements
Housing construction sequence animation

Envelope, thermal mass, ventilation and rainwater collection work together. Adaptable foundations beneath a repeatable upper structure accommodate different slopes.

Housing construction section: Trombe wall and foundation
Bioclimatic section: sunlight, ventilation and rainwater harvesting

I coordinated spatial strategies, housing prototypes, technical interfaces and budget studies so that interventions at plot, public-building and household scales could be discussed and implemented in phases. Proposals include collaboration with community governance and participatory budgeting, accounting for training, maintenance, quality checks and contingencies. Course estimates of EUR 470 and 342/m² differ by about 27%; this has not been verified through construction.

One housing unit adapted to three slope ranges